Power problems are for building maintenance not IT.
At the moment, for sure.
I just hope the UPS’s hold up until the generators start, and that everything was properly connected to the appropriate power.
That is what 6 month testing is for.
An untested backup isn’t a backup.
I feel like this would be the equivalent to if non of my students showed up to class.
Sure, this is maintenance, but if they aren’t faster than the UPS and generator cutover (if those even exist). Then it is your problem.
Depending on size of company and equipment. This could be an all day exercise.